GREEN CONSTRUCTION ASSESSMENT MODEL IN BUILDING CONSTRUCTION PROCESS IN INDONESIA USING FUZZY ANALYTICAL HIERARCHY PROCESS (FAHP)
A construction assessment system is needed to determine the relationship between green construction and sustainable development aspects. The green construction assessment model developed by Ervianto has not been able to accommodate the nature of human judgment, which reflects the concept of fuzzines...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/50956 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |