Standard Work Information System Design for Supporting Just In Time Implementation In Lean Production System
Globalization has forced manufacturing companies to produce low cost and high quality product with high product variations in order to survive in this global competition. Lean production system becomes popular among manufacturing companies in producing low cost and high quality product effectivel...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40695 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:40695 |
---|---|
spelling |
id-itb.:406952019-07-08T10:54:23ZStandard Work Information System Design for Supporting Just In Time Implementation In Lean Production System Riyanto Setiadi, Roy Indonesia Final Project lean production system, just in time (JIT), takt time, cycle time, standard work management tool. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/40695 Globalization has forced manufacturing companies to produce low cost and high quality product with high product variations in order to survive in this global competition. Lean production system becomes popular among manufacturing companies in producing low cost and high quality product effectively by reducing wastes in production. Just in time (JIT) concept is one of lean production system pillars. The JIT idea is to produce a number of product as many as number of demand. One method to implement JIT is to establish takt time (production rate) which is decided every month based on number of demand. Because of that, number of man and human work distribution need to be planned through standard work every month. Standard work is used to plan effectively sequence of repetitive human work (less waste) in one production cell and to plan number of work in process needed in order to create consistent and stable production based on decided production rate. Takt time and standard work planning which must be changed every month will be easier and more consistent if assisted by tools. This research was developing tools to manage standard work planning in form of standard work management information system. This information system design was started by identifying objects and its attributes found in the problem. After the objects had been decided, they became reference for designing suitable database. The next step was designing process model to define information process flow. Next, the graphic user interface (GUI) has been written by using web based programming language. At last, the web based application was tested by using data which was taken from real case study. Furthermore, the result from the test would be used to modify this application. The output of this research is a web based standard work application that acted as bridge between user and system. The application could assist modeling work in a production cell, calculate takt time, calculate cycle time, calculate number of manpower needed by a production cell, calculate standard production capacity, assist operator work distribution by standard work, establish number of WIP needed in each work station, and print the information in hardcopy. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Globalization has forced manufacturing companies to produce low cost and
high quality product with high product variations in order to survive in this global
competition. Lean production system becomes popular among manufacturing
companies in producing low cost and high quality product effectively by reducing
wastes in production. Just in time (JIT) concept is one of lean production system
pillars. The JIT idea is to produce a number of product as many as number of
demand.
One method to implement JIT is to establish takt time (production rate)
which is decided every month based on number of demand. Because of that,
number of man and human work distribution need to be planned through standard
work every month. Standard work is used to plan effectively sequence of repetitive
human work (less waste) in one production cell and to plan number of work in
process needed in order to create consistent and stable production based on
decided production rate. Takt time and standard work planning which must be
changed every month will be easier and more consistent if assisted by tools. This
research was developing tools to manage standard work planning in form of
standard work management information system.
This information system design was started by identifying objects and its
attributes found in the problem. After the objects had been decided, they became
reference for designing suitable database. The next step was designing process
model to define information process flow. Next, the graphic user interface (GUI)
has been written by using web based programming language. At last, the web
based application was tested by using data which was taken from real case study.
Furthermore, the result from the test would be used to modify this application.
The output of this research is a web based standard work application that
acted as bridge between user and system. The application could assist modeling
work in a production cell, calculate takt time, calculate cycle time, calculate
number of manpower needed by a production cell, calculate standard production
capacity, assist operator work distribution by standard work, establish number of
WIP needed in each work station, and print the information in hardcopy. |
format |
Final Project |
author |
Riyanto Setiadi, Roy |
spellingShingle |
Riyanto Setiadi, Roy Standard Work Information System Design for Supporting Just In Time Implementation In Lean Production System |
author_facet |
Riyanto Setiadi, Roy |
author_sort |
Riyanto Setiadi, Roy |
title |
Standard Work Information System Design for Supporting Just In Time Implementation In Lean Production System |
title_short |
Standard Work Information System Design for Supporting Just In Time Implementation In Lean Production System |
title_full |
Standard Work Information System Design for Supporting Just In Time Implementation In Lean Production System |
title_fullStr |
Standard Work Information System Design for Supporting Just In Time Implementation In Lean Production System |
title_full_unstemmed |
Standard Work Information System Design for Supporting Just In Time Implementation In Lean Production System |
title_sort |
standard work information system design for supporting just in time implementation in lean production system |
url |
https://digilib.itb.ac.id/gdl/view/40695 |
_version_ |
1822925821032005632 |