FINANCIAL FEASIBILITY STUDY OF TOLL ROAD PROJECT BOGOR â SERPONG VIA PARUNG
Indonesia's economic growth in 2010 to 2015 has been decreased due to the global economic slowdown. Indonesia's economic growth can be increase by increasing the number of commodity exports, household consumptions, and structural changes. The structural changes can form of the development...
Saved in:
Main Author: | Laregan Jota, Astrid |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40861 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF SOFT CLAY SOIL TREATMENT USING COMBINATION OF PVD AND GEOTEXTILE WOVEN CASE STUDY: BOGOR - SERPONG JORR-3 TOLL ROAD PROJECT PLANNING
by: Aditya Wuladarman, Resnu -
FINANCIAL FEASIBILITY STUDY OF PANGKALAN BRANDAN â LANGSA TOLL ROAD PROJECT
by: Muliawan, Mahar -
ANALYSIS THE IMPACT OF LAND ACQUISITION GUARANTEE ON FINANCIAL FEASIBILITY TOLL ROAD PROJECT IN INDONESIA (CASE STUDY: JAKARTA-CIKAMPEK II TOLL ROAD PROJECT)
by: NUR HASANAH, SAFIRA -
FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
by: AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA -
ANALYSIS OF THE PASSENGER CAR TRAVEL COSTS IN FLOOD CONDITIONS (CASE STUDY PONDOK AREN â SERPONG TOLL ROAD)
by: Ikhwanus Sofa, Mohammad