STUDY OF SOFT CLAY SOIL TREATMENT USING COMBINATION OF PVD AND GEOTEXTILE WOVEN CASE STUDY: BOGOR - SERPONG JORR-3 TOLL ROAD PROJECT PLANNING

The planned of Jakarta Outer Ring Road (JORR)-3 Toll Road with a total length of 31 km, which connects Bogor City and Serpong City, through a subgrade consisting of 17 km of soft clay and 14 km of medium clay. Soil investigations that have been carried out are 30 points of sondir test, 13 points o...

Full description

Saved in:
Bibliographic Details
Main Author: Aditya Wuladarman, Resnu
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/71246
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia