STUDY OF SOFT CLAY SOIL TREATMENT USING COMBINATION OF PVD AND GEOTEXTILE WOVEN CASE STUDY: BOGOR - SERPONG JORR-3 TOLL ROAD PROJECT PLANNING
The planned of Jakarta Outer Ring Road (JORR)-3 Toll Road with a total length of 31 km, which connects Bogor City and Serpong City, through a subgrade consisting of 17 km of soft clay and 14 km of medium clay. Soil investigations that have been carried out are 30 points of sondir test, 13 points o...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/71246 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |