導出完成 — 

STUDY OF SOFT CLAY SOIL TREATMENT USING COMBINATION OF PVD AND GEOTEXTILE WOVEN CASE STUDY: BOGOR - SERPONG JORR-3 TOLL ROAD PROJECT PLANNING

The planned of Jakarta Outer Ring Road (JORR)-3 Toll Road with a total length of 31 km, which connects Bogor City and Serpong City, through a subgrade consisting of 17 km of soft clay and 14 km of medium clay. Soil investigations that have been carried out are 30 points of sondir test, 13 points o...

全面介紹

Saved in:
書目詳細資料
主要作者: Aditya Wuladarman, Resnu
格式: Theses
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/71246
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia