APPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ

According to the global economy, on 2017 Agricultural sectors in Indonesia are adequate to give contribution 13.15% towards country’s aggregate Gross Domestic Product. On 2017, Badan Pusat Statistik stated that, the consumption of fruit and vegetables until 2016, showed that almost all of Indonesian...

Full description

Saved in:
Bibliographic Details
Main Author: Amani, Salma
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/40955
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:40955
spelling id-itb.:409552019-07-19T08:34:35ZAPPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ Amani, Salma Indonesia Final Project Agriculture, multiple cropping rotation, optimisation method, scheduling, linear programming, mathematical model, gantt chart INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/40955 According to the global economy, on 2017 Agricultural sectors in Indonesia are adequate to give contribution 13.15% towards country’s aggregate Gross Domestic Product. On 2017, Badan Pusat Statistik stated that, the consumption of fruit and vegetables until 2016, showed that almost all of Indonesian citizen which is 97,29 percent of them consumed vegetables. Vegetables is one of agriculture industry that are potential to be developed. Proven by the production number from 2012 until 2016 is always increasing. One of vegetables that have potential to grow is carrot, rather than other various types of vegetables, carrot still has 2,87% growth from 2012 to 2016. PT. XYZ seen this situation as their opportunities to run their business activities. The company are planning to produce agricultural product such as vegetables, specifically carrot. To stabilize the harvesting process, PT. XYZ will applied multiple crop rotation method. The company decide the supporting plants will be sweet corn and scallion. To develop and present an optimization model of production planning, project scheduling will applied as the tool to demonstrate the production planning. Construct schedule in production planning, developing linear programming is needed to create the mathematical model. Before build the model, several data that related to the model require to be gathered. According to Darst (1990), there are three components involved to formulate linear programming into a model, which are specify the decision variables, constraints and the objective function. Subsequently the completed model can be running in software named MATLAB. The result from processing in MATLAB, shows the amount of required land and the pattern of rotation so the company could meet the weekly demand of each commodities for time period 52 weeks. From the final result, it can concluded that PT. XYZ need 1,893 ha so the company could fulfil the weekly demand of each commodities and so the rotation system could be performed based on principle of rotation system For more specifically 60 plotting area with each area has sizes for ?315 m2 are needed to utilized text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description According to the global economy, on 2017 Agricultural sectors in Indonesia are adequate to give contribution 13.15% towards country’s aggregate Gross Domestic Product. On 2017, Badan Pusat Statistik stated that, the consumption of fruit and vegetables until 2016, showed that almost all of Indonesian citizen which is 97,29 percent of them consumed vegetables. Vegetables is one of agriculture industry that are potential to be developed. Proven by the production number from 2012 until 2016 is always increasing. One of vegetables that have potential to grow is carrot, rather than other various types of vegetables, carrot still has 2,87% growth from 2012 to 2016. PT. XYZ seen this situation as their opportunities to run their business activities. The company are planning to produce agricultural product such as vegetables, specifically carrot. To stabilize the harvesting process, PT. XYZ will applied multiple crop rotation method. The company decide the supporting plants will be sweet corn and scallion. To develop and present an optimization model of production planning, project scheduling will applied as the tool to demonstrate the production planning. Construct schedule in production planning, developing linear programming is needed to create the mathematical model. Before build the model, several data that related to the model require to be gathered. According to Darst (1990), there are three components involved to formulate linear programming into a model, which are specify the decision variables, constraints and the objective function. Subsequently the completed model can be running in software named MATLAB. The result from processing in MATLAB, shows the amount of required land and the pattern of rotation so the company could meet the weekly demand of each commodities for time period 52 weeks. From the final result, it can concluded that PT. XYZ need 1,893 ha so the company could fulfil the weekly demand of each commodities and so the rotation system could be performed based on principle of rotation system For more specifically 60 plotting area with each area has sizes for ?315 m2 are needed to utilized
format Final Project
author Amani, Salma
spellingShingle Amani, Salma
APPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ
author_facet Amani, Salma
author_sort Amani, Salma
title APPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ
title_short APPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ
title_full APPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ
title_fullStr APPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ
title_full_unstemmed APPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ
title_sort application of project scheduling towards multiple cropping process to achieve maximum land optimization in pt. xyz
url https://digilib.itb.ac.id/gdl/view/40955
_version_ 1822269682904727552