APPLICATION OF PROJECT SCHEDULING TOWARDS MULTIPLE CROPPING PROCESS TO ACHIEVE MAXIMUM LAND OPTIMIZATION IN PT. XYZ
According to the global economy, on 2017 Agricultural sectors in Indonesia are adequate to give contribution 13.15% towards country’s aggregate Gross Domestic Product. On 2017, Badan Pusat Statistik stated that, the consumption of fruit and vegetables until 2016, showed that almost all of Indonesian...
Saved in:
Main Author: | Amani, Salma |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40955 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Achievable rates and optimal schedules for half duplex multiple-relay networks
by: Ong, L., et al.
Published: (2014) -
PIT OPTIMIZATION AND SCHEDULING COAL MINES PT XYZ
by: Adjie Pramudya, Danung -
Determining the bioenergy potential of multiple crops (palm oil, soybean and sugarcane) in the Philippines by land suitability analysis
by: Bacayo, JV Nicole Pausal, et al.
Published: (2022) -
Integration of land evaluation and the analytical hierarchical process method for energy crops in Kanchanaburi, Thailand
by: Kanlaya Tienwonga, et al.
Published: (2018) -
OPTIMIZATION AND SCHEDULING OF OPEN PIT MINING IN LIMESTONE MINING AT PT XYZ IN SOUTH KALIMANTAN
by: Fitra Mulyadi, Fauzan