OPTIMUM COST ANALYSIS OF ACCELERATION PROJECT WITH TIME COST TRADE OFF ANALYSIS METHOD (Case Study: Construction Project of Industrial Waste Treatment Facilities)
Today construction projects in Indonesia are growing rapidly. This was showed by the many development projects carried out by the government and the private sector both on a large scale and in a small scale. With the development project that continues to run, it will open up employment opportunit...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/41046 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |