OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)

Indonesia, with a population of over 275 million, faces significant challenges in improving infrastructure due to its archipelagic geography. The Indonesian government has been striving to accelerate infrastructure development through the National Long-Term Development Plan (RPJPN) 2025-2045 to s...