OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)

Indonesia, with a population of over 275 million, faces significant challenges in improving infrastructure due to its archipelagic geography. The Indonesian government has been striving to accelerate infrastructure development through the National Long-Term Development Plan (RPJPN) 2025-2045 to s...

Full description

Saved in:
Bibliographic Details
Main Author: Rizki Khairi, Fajar
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/82574
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:82574
spelling id-itb.:825742024-07-09T09:31:00ZOPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG) Rizki Khairi, Fajar Teknik sipil Indonesia Final Project Project Schedule Acceleration, Optimum Cost, Floor-to-Floor Scheme INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/82574 Indonesia, with a population of over 275 million, faces significant challenges in improving infrastructure due to its archipelagic geography. The Indonesian government has been striving to accelerate infrastructure development through the National Long-Term Development Plan (RPJPN) 2025-2045 to support the Vision of Golden Indonesia 2045, including strengthening health infrastructure. This study focuses on accelerating the project schedule for the construction of the Mother and Child Service Center at Hasan Sadikin Hospital Bandung, particularly on structural works such as beams, columns, slabs, and shear walls. The aim of the research is to identify applicable acceleration alternatives and analyze their impact on the construction project schedule. The methodology used is a quantitative approach using empirical data to develop a project scheduling optimization model. The research results show that indirect costs are not significant to the optimal cost of project acceleration, with a percentage between 4-6%. The optimal scenario was found in the floor-to-floor 6-day alternative with an additional cost per day of Rp302,206,723.20 or 0.397% of the total cost under normal conditions. This study provides significant contributions to construction project management through a deductive approach and quantitative analysis, which can help practitioners and researchers improve the efficiency and effectiveness of project management. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Rizki Khairi, Fajar
OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)
description Indonesia, with a population of over 275 million, faces significant challenges in improving infrastructure due to its archipelagic geography. The Indonesian government has been striving to accelerate infrastructure development through the National Long-Term Development Plan (RPJPN) 2025-2045 to support the Vision of Golden Indonesia 2045, including strengthening health infrastructure. This study focuses on accelerating the project schedule for the construction of the Mother and Child Service Center at Hasan Sadikin Hospital Bandung, particularly on structural works such as beams, columns, slabs, and shear walls. The aim of the research is to identify applicable acceleration alternatives and analyze their impact on the construction project schedule. The methodology used is a quantitative approach using empirical data to develop a project scheduling optimization model. The research results show that indirect costs are not significant to the optimal cost of project acceleration, with a percentage between 4-6%. The optimal scenario was found in the floor-to-floor 6-day alternative with an additional cost per day of Rp302,206,723.20 or 0.397% of the total cost under normal conditions. This study provides significant contributions to construction project management through a deductive approach and quantitative analysis, which can help practitioners and researchers improve the efficiency and effectiveness of project management.
format Final Project
author Rizki Khairi, Fajar
author_facet Rizki Khairi, Fajar
author_sort Rizki Khairi, Fajar
title OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)
title_short OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)
title_full OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)
title_fullStr OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)
title_full_unstemmed OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)
title_sort optimal cost analysis for project schedule acceleration (case study: mother and child hospital construction project of dr. hasan sadikin bandung)
url https://digilib.itb.ac.id/gdl/view/82574
_version_ 1822009820164653056