OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)
Indonesia, with a population of over 275 million, faces significant challenges in improving infrastructure due to its archipelagic geography. The Indonesian government has been striving to accelerate infrastructure development through the National Long-Term Development Plan (RPJPN) 2025-2045 to s...
Saved in:
Main Author: | Rizki Khairi, Fajar |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/82574 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION STUDY OF IMPLEMENTATION LEAN CONSTRUCTION ON BUILDING PROJECT IN INDONESIACASE STUDY : BUILDING CONSTRUCTION WORKS FOR MOTHER AND CHILD HEALTH CARE CENTER DR. HASAN SADIKIN HOSPITAL BANDUNG
by: Vinesa Ulima, Zefanya -
DESIGN OF THE MOTHER AND CHILD HEALTH CARE BUILDING AT HASAN SADIKIN HOSPITAL, BANDUNG
by: Clement, Yonathan -
DESIGN OF DIAPHRAGM WALL AND BORED PILE FOUNDATIONS OF MOTHER AND CHILD SERVICE CENTRE HASAN SADIKIN HOSPITAL BANDUNG
by: Dwi Wirasena, Aditya -
NORTH BUILDING STRUCTURAL DESIGN OF MOTHER AND CHILD HOSPITAL IN MEDAN
by: WIJAKSONO , GORBY -
RISK ANALYSIS OF COST OVERRUN IN DAM CONSTRUCTION PROJECT DUE TO CHANGE ORDER
by: Sella Fajar, Sandy