EARNED VALUE ANALYSIS FOR AIRCRAFT MANUFACTURING PROJECTS

Indonesian Aerospace is engaged in the manufacture and sale of Aircraft and Helicopters and Services. Timely, precise costing and project accuracy are the key success factors to be considered in aircraft manufacturing project to measure both efficiency and effectiveness in the use of resources in...

Full description

Saved in:
Bibliographic Details
Main Author: Burhanudin, Dindin
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/41229
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:41229
spelling id-itb.:412292019-07-31T14:56:45ZEARNED VALUE ANALYSIS FOR AIRCRAFT MANUFACTURING PROJECTS Burhanudin, Dindin Manajemen umum Indonesia Theses Variance Method, EVM, Aircraft manufacturing projects, PMBOK, delayed on delivery INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/41229 Indonesian Aerospace is engaged in the manufacture and sale of Aircraft and Helicopters and Services. Timely, precise costing and project accuracy are the key success factors to be considered in aircraft manufacturing project to measure both efficiency and effectiveness in the use of resources in the aircraft manufacturing project. At this time, the problem of on-time delivery has been the main issue in the aircraft delivery at IAe, so it needs a more precise method and accurate which can measure the performance status to predict more accurate result of project in future. In variance method the project cost monitoring and control, display comparisons between planned cost and actual and each other is controlled separately (cost, schedule, and performance). The variance method potentially creates burdens in evaluating project’s progression and forecasting of both schedule and cost performance at completion. This research focuses on eliminating those issues through implementation of Earned Value Management (EVM) method as part of Project Management Body of Knowledge (PMBOK). In EVM method can combine three dimensions, which are scheduled, cost and work performance so that it can be estimated the cost and time to complete the project. The ultimate benefits will be improvement on cost efficiency and on-time delivery of the aircraft manufacturing. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Burhanudin, Dindin
EARNED VALUE ANALYSIS FOR AIRCRAFT MANUFACTURING PROJECTS
description Indonesian Aerospace is engaged in the manufacture and sale of Aircraft and Helicopters and Services. Timely, precise costing and project accuracy are the key success factors to be considered in aircraft manufacturing project to measure both efficiency and effectiveness in the use of resources in the aircraft manufacturing project. At this time, the problem of on-time delivery has been the main issue in the aircraft delivery at IAe, so it needs a more precise method and accurate which can measure the performance status to predict more accurate result of project in future. In variance method the project cost monitoring and control, display comparisons between planned cost and actual and each other is controlled separately (cost, schedule, and performance). The variance method potentially creates burdens in evaluating project’s progression and forecasting of both schedule and cost performance at completion. This research focuses on eliminating those issues through implementation of Earned Value Management (EVM) method as part of Project Management Body of Knowledge (PMBOK). In EVM method can combine three dimensions, which are scheduled, cost and work performance so that it can be estimated the cost and time to complete the project. The ultimate benefits will be improvement on cost efficiency and on-time delivery of the aircraft manufacturing.
format Theses
author Burhanudin, Dindin
author_facet Burhanudin, Dindin
author_sort Burhanudin, Dindin
title EARNED VALUE ANALYSIS FOR AIRCRAFT MANUFACTURING PROJECTS
title_short EARNED VALUE ANALYSIS FOR AIRCRAFT MANUFACTURING PROJECTS
title_full EARNED VALUE ANALYSIS FOR AIRCRAFT MANUFACTURING PROJECTS
title_fullStr EARNED VALUE ANALYSIS FOR AIRCRAFT MANUFACTURING PROJECTS
title_full_unstemmed EARNED VALUE ANALYSIS FOR AIRCRAFT MANUFACTURING PROJECTS
title_sort earned value analysis for aircraft manufacturing projects
url https://digilib.itb.ac.id/gdl/view/41229
_version_ 1822925935992635392