PROPOSED CORPORATE PERFORMANCE MANAGEMENT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM AT PT. XAY

The blooming of the construction sector in Indonesia has become a target for many construction companies both local-based and foreign-based to expand their market and increasing revenue. PT. XAY, one of small-medium business construction company in Indonesia, a recent financial report is good in...

Full description

Saved in:
Bibliographic Details
Main Author: Destryan, Ryan
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/41276
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:41276
spelling id-itb.:412762019-08-03T11:45:09ZPROPOSED CORPORATE PERFORMANCE MANAGEMENT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM AT PT. XAY Destryan, Ryan Indonesia Theses Key Performance Indicators, Integrated Performance Management System, Small Medium Enterprise, Construction Company, Analytical Hierarchy Process INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/41276 The blooming of the construction sector in Indonesia has become a target for many construction companies both local-based and foreign-based to expand their market and increasing revenue. PT. XAY, one of small-medium business construction company in Indonesia, a recent financial report is good in term of revenue but bad in term of profit. The slow growth can make the company cannot expand to a bigger level and the project cannot grow bigger to enhance the company’s reputation and financial position. Root cause analysis was conducted to find the root problem from the issue, which turned out to be no performance management system applied. Integrated Performance Management System (Wibisono, 2012) used as the Performance Management System framework in designing the performance management in this research. Five stages of Integrated Performance Management System conducted in the company. Indicators designed from review in literature and interview with the director of the company. Importance of the indicator is measured using Analytical Hierarchy Process also as linkage analysis. The result for the key variable in PT XAY from business result perspective is profitability, cash flow performance and customer satisfaction. From internal process perspective is new project, marketing effectiveness, process efficiency and capacity availability. From resource capability is employment and organization management. With the application of the performance management system, the company should have indicators to measure the progress of the company’s growth and help the company to achieve its vision. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The blooming of the construction sector in Indonesia has become a target for many construction companies both local-based and foreign-based to expand their market and increasing revenue. PT. XAY, one of small-medium business construction company in Indonesia, a recent financial report is good in term of revenue but bad in term of profit. The slow growth can make the company cannot expand to a bigger level and the project cannot grow bigger to enhance the company’s reputation and financial position. Root cause analysis was conducted to find the root problem from the issue, which turned out to be no performance management system applied. Integrated Performance Management System (Wibisono, 2012) used as the Performance Management System framework in designing the performance management in this research. Five stages of Integrated Performance Management System conducted in the company. Indicators designed from review in literature and interview with the director of the company. Importance of the indicator is measured using Analytical Hierarchy Process also as linkage analysis. The result for the key variable in PT XAY from business result perspective is profitability, cash flow performance and customer satisfaction. From internal process perspective is new project, marketing effectiveness, process efficiency and capacity availability. From resource capability is employment and organization management. With the application of the performance management system, the company should have indicators to measure the progress of the company’s growth and help the company to achieve its vision.
format Theses
author Destryan, Ryan
spellingShingle Destryan, Ryan
PROPOSED CORPORATE PERFORMANCE MANAGEMENT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM AT PT. XAY
author_facet Destryan, Ryan
author_sort Destryan, Ryan
title PROPOSED CORPORATE PERFORMANCE MANAGEMENT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM AT PT. XAY
title_short PROPOSED CORPORATE PERFORMANCE MANAGEMENT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM AT PT. XAY
title_full PROPOSED CORPORATE PERFORMANCE MANAGEMENT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM AT PT. XAY
title_fullStr PROPOSED CORPORATE PERFORMANCE MANAGEMENT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM AT PT. XAY
title_full_unstemmed PROPOSED CORPORATE PERFORMANCE MANAGEMENT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM AT PT. XAY
title_sort proposed corporate performance management using integrated performance management system at pt. xay
url https://digilib.itb.ac.id/gdl/view/41276
_version_ 1822925947528019968