CONSTRUCTION MANAGEMENT ASPECT DESIGN OF MASJID AGUNG SRIWIJAYA AT JAKABARING, PALEMBANG

The increasing number of residents who are Muslim in Palembang is not accompanied by equal distribution of the number and location of mosques, especially in the Jakabaring Sport City Region. Masijd Agung Sriwijaya is a fulfillment of the needs of the representative Muslim worship facilities for Pale...

Full description

Saved in:
Bibliographic Details
Main Author: Lovanda Claudia A., Sebayang
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/42550
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:42550
spelling id-itb.:425502019-09-20T13:11:37ZCONSTRUCTION MANAGEMENT ASPECT DESIGN OF MASJID AGUNG SRIWIJAYA AT JAKABARING, PALEMBANG Lovanda Claudia A., Sebayang Indonesia Final Project Estimated Construction Costs, Construction Implementation Method, Masijd Agung Sriwijaya, Palembang, Jakabaring INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/42550 The increasing number of residents who are Muslim in Palembang is not accompanied by equal distribution of the number and location of mosques, especially in the Jakabaring Sport City Region. Masijd Agung Sriwijaya is a fulfillment of the needs of the representative Muslim worship facilities for Palembang community to accommodate and complement religious, social and sports activities. It is necessary to design good management aspects in realizing this project both in terms of time, quality, and cost. Therefore, the scope of this Final Project generally includes making Work Breakdown Structures, planning implementation methods, calculating work volume, determining the schedule work based on productivity, and estimating project costs in detail for preparatory work, earthworks, lower structural work, upper structural work, and outdoor work. Work volume calculation is done using manual calculation. Determination of the duration of work is based on two factors, namely based on the lead resouces of heavy equipment and labor lead resources. The detailed cost estimation is carried out using two methods, namely the unit price using SNI and Permen PU No. 28 on 2016 and resource enumeration. The implementation of the Masjid Agung Sriwijaya project will take place from 1 July 2019 to 8 March 2021 with a total duration of 440 days or 13,3 months. Preparatory work was carried out for 39 days, lower structure work for 221 days, top structural work for 307 days, and outdoor work for 16 days. The project budget plan (RAB) is Rp86.123.991.959,- with a percentage of costs, namely 2,76% for preparatory work, 47,88% for lower structural work, and 48,14% for upper structural work, and 1,21% for outdoor work. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The increasing number of residents who are Muslim in Palembang is not accompanied by equal distribution of the number and location of mosques, especially in the Jakabaring Sport City Region. Masijd Agung Sriwijaya is a fulfillment of the needs of the representative Muslim worship facilities for Palembang community to accommodate and complement religious, social and sports activities. It is necessary to design good management aspects in realizing this project both in terms of time, quality, and cost. Therefore, the scope of this Final Project generally includes making Work Breakdown Structures, planning implementation methods, calculating work volume, determining the schedule work based on productivity, and estimating project costs in detail for preparatory work, earthworks, lower structural work, upper structural work, and outdoor work. Work volume calculation is done using manual calculation. Determination of the duration of work is based on two factors, namely based on the lead resouces of heavy equipment and labor lead resources. The detailed cost estimation is carried out using two methods, namely the unit price using SNI and Permen PU No. 28 on 2016 and resource enumeration. The implementation of the Masjid Agung Sriwijaya project will take place from 1 July 2019 to 8 March 2021 with a total duration of 440 days or 13,3 months. Preparatory work was carried out for 39 days, lower structure work for 221 days, top structural work for 307 days, and outdoor work for 16 days. The project budget plan (RAB) is Rp86.123.991.959,- with a percentage of costs, namely 2,76% for preparatory work, 47,88% for lower structural work, and 48,14% for upper structural work, and 1,21% for outdoor work.
format Final Project
author Lovanda Claudia A., Sebayang
spellingShingle Lovanda Claudia A., Sebayang
CONSTRUCTION MANAGEMENT ASPECT DESIGN OF MASJID AGUNG SRIWIJAYA AT JAKABARING, PALEMBANG
author_facet Lovanda Claudia A., Sebayang
author_sort Lovanda Claudia A., Sebayang
title CONSTRUCTION MANAGEMENT ASPECT DESIGN OF MASJID AGUNG SRIWIJAYA AT JAKABARING, PALEMBANG
title_short CONSTRUCTION MANAGEMENT ASPECT DESIGN OF MASJID AGUNG SRIWIJAYA AT JAKABARING, PALEMBANG
title_full CONSTRUCTION MANAGEMENT ASPECT DESIGN OF MASJID AGUNG SRIWIJAYA AT JAKABARING, PALEMBANG
title_fullStr CONSTRUCTION MANAGEMENT ASPECT DESIGN OF MASJID AGUNG SRIWIJAYA AT JAKABARING, PALEMBANG
title_full_unstemmed CONSTRUCTION MANAGEMENT ASPECT DESIGN OF MASJID AGUNG SRIWIJAYA AT JAKABARING, PALEMBANG
title_sort construction management aspect design of masjid agung sriwijaya at jakabaring, palembang
url https://digilib.itb.ac.id/gdl/view/42550
_version_ 1821998637344882688