OPERATING EXPENSES PORTFOLIO PRIORITIZATION BY USING SIMPLE MULTI-ATTRIBUTE RATING TECHNIQUE (SMART) AND ANALYTIC HIERARCY PROCESS (AHP) METHOD (CASE STUDY: PT. PETROLEUM CENTRAL INDONESIA)
With the end of RKN Block PSC in 2021, PCI is expected to optimize its cost by maintaining lower Non-Fuel Lifting cost of oil production. Operations & Maintenance (O&M) as one of the core group in PCI has responsibilities to deliver oil production as per business plan target with minimum OPE...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/42979 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!