Flare Minimization Study in Normal Condition on Gas Production System at X Platform

ABC field is one of oil and gas producer located at offshore Natuna sea that has 4 production platforms. Gas produced from this field is exported through subsea pipeline to the costumer. Gas produced from all platforms is flowed to X platform which has complete gas processing system. This platform h...

Full description

Saved in:
Bibliographic Details
Main Author: Dewi, Nuryah
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43042
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items