DESIGN OF CONSTRUCTION MANAGEMENT OF PASSENGERS TERMINAL, MOA PORT, MALUKU
Indonesia’s urbanization rate in 2015 has reached 54% and is predicted to increase until 66% in 2035. To facilitate the mobilization of Indonesian, infrastructures such as port is needed. Since 2014 – 2018, the government of Indonesia has succeeded in building around 19 ports throughout Indonesia. I...
Saved in:
Main Author: | Permana Rachman, Gilang |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43098 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LANDSIDE FACILITIES DESIGN FOR CONTAINER PORT TERMINAL AND MICROSIMULATION ANALYSIS FOR PASSENGER MOVEMENT AT THE PASSENGER PORT TERMINAL IN BAKAUHENI
by: Dwi Adinda, Vania -
SITE SELECTION AND LAYOUT PLANNING FOR PASSENGER PORT OF TULEHU, MALUKU, INDONESIA
by: Ad'nan, Arinor -
REDESIGN PORT TERMINAL PASSENGER AT TANJUNG PRIOK, JAKARTA
by: Rahtiandari, Nungky -
DESIGNING BELAWAN PORT PASSENGER TERMINAL WITH APPROACH OF CONNECTIVITY AS FORMING âPLACEâ
by: Wiyadi, Suria -
SELECTION OF LOCATION AND PLANNING OF PASSENGER PORT LAYOUT IN LEROKIS, UHAK, MALUKU SOUTHWEST
by: Peres Kembaren, Chrisna