EVALUATION AND RETROFITTING WATER TREATMENT PLANT OF METROPOLITAN DRINKING WATER SUPPLY SYSTEM SOUTH BANDUNG REGION PHASE I

The availability of sufficient water in quantity, quality, and continuity is very important for human being. For this reason, a Water Treatment Plant is needed that will process raw water to meet certain standards. The Phase I South Bandung Regional SPAM Project was initiated by the Ministry of PUPR...

Full description

Saved in:
Bibliographic Details
Main Author: Farida Sihaloho, Asri
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/43104
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43104
spelling id-itb.:431042019-09-25T14:28:10ZEVALUATION AND RETROFITTING WATER TREATMENT PLANT OF METROPOLITAN DRINKING WATER SUPPLY SYSTEM SOUTH BANDUNG REGION PHASE I Farida Sihaloho, Asri Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project idle capacity, evaluation, retrofitting, WTP INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43104 The availability of sufficient water in quantity, quality, and continuity is very important for human being. For this reason, a Water Treatment Plant is needed that will process raw water to meet certain standards. The Phase I South Bandung Regional SPAM Project was initiated by the Ministry of PUPR, Directorate General of Cipta Karya in collaboration with the Directorate General of Water Resources. WTP Phase I is designed with a capacity of 350 L/s. Clean water will be supplied to PDAM Kota Bandung in the amount of 200 L/s and PDAM Bandung Regency of 150 L/s through their respective reservoirs. The condition that occurs at this time is the existence of a water crisis that occurred in Bandung City and Bandung Regency. The 28 artesian wells owned by PDAM Kota Bandung are mostly dead. Only a few are still active, with water flow continuing to decline. This makes the supply of clean water to residents decreased (Kompas, 2018). In addition Situ Cileunca and Cipanunjang as raw water for PDAM are still receding (Tribun Jabar, 2018). The current WTP evaluation is an idle capacity of 150 L/s so that the current capacity is only 200 L/s. This condition must be addressed immediately because Bandung city and Bandung Regency need a large enough water supply to overcome the clean water crisis that has occurred. Therefore it is necessary to conduct evaluation and retrofitting, namely to make engineering improvements to the WTP units that have been built in order to achieve initial design capacity. So that it is expected that this PDAM can help PDAM Bandung Regency and Bandung City. The WTP unit will be evaluated in advance to determine its compliance with the design criteria. Then units that do not meet the design criteria will be retrofitted so that the unit can work optimally. From the evaluation results, the units to be retrofitted is filtration. Alternative design improvements for this unit is filtration using a rapid sand filter with dual media. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik saniter dan perkotaan; teknik perlindungan lingkungan
spellingShingle Teknik saniter dan perkotaan; teknik perlindungan lingkungan
Farida Sihaloho, Asri
EVALUATION AND RETROFITTING WATER TREATMENT PLANT OF METROPOLITAN DRINKING WATER SUPPLY SYSTEM SOUTH BANDUNG REGION PHASE I
description The availability of sufficient water in quantity, quality, and continuity is very important for human being. For this reason, a Water Treatment Plant is needed that will process raw water to meet certain standards. The Phase I South Bandung Regional SPAM Project was initiated by the Ministry of PUPR, Directorate General of Cipta Karya in collaboration with the Directorate General of Water Resources. WTP Phase I is designed with a capacity of 350 L/s. Clean water will be supplied to PDAM Kota Bandung in the amount of 200 L/s and PDAM Bandung Regency of 150 L/s through their respective reservoirs. The condition that occurs at this time is the existence of a water crisis that occurred in Bandung City and Bandung Regency. The 28 artesian wells owned by PDAM Kota Bandung are mostly dead. Only a few are still active, with water flow continuing to decline. This makes the supply of clean water to residents decreased (Kompas, 2018). In addition Situ Cileunca and Cipanunjang as raw water for PDAM are still receding (Tribun Jabar, 2018). The current WTP evaluation is an idle capacity of 150 L/s so that the current capacity is only 200 L/s. This condition must be addressed immediately because Bandung city and Bandung Regency need a large enough water supply to overcome the clean water crisis that has occurred. Therefore it is necessary to conduct evaluation and retrofitting, namely to make engineering improvements to the WTP units that have been built in order to achieve initial design capacity. So that it is expected that this PDAM can help PDAM Bandung Regency and Bandung City. The WTP unit will be evaluated in advance to determine its compliance with the design criteria. Then units that do not meet the design criteria will be retrofitted so that the unit can work optimally. From the evaluation results, the units to be retrofitted is filtration. Alternative design improvements for this unit is filtration using a rapid sand filter with dual media.
format Final Project
author Farida Sihaloho, Asri
author_facet Farida Sihaloho, Asri
author_sort Farida Sihaloho, Asri
title EVALUATION AND RETROFITTING WATER TREATMENT PLANT OF METROPOLITAN DRINKING WATER SUPPLY SYSTEM SOUTH BANDUNG REGION PHASE I
title_short EVALUATION AND RETROFITTING WATER TREATMENT PLANT OF METROPOLITAN DRINKING WATER SUPPLY SYSTEM SOUTH BANDUNG REGION PHASE I
title_full EVALUATION AND RETROFITTING WATER TREATMENT PLANT OF METROPOLITAN DRINKING WATER SUPPLY SYSTEM SOUTH BANDUNG REGION PHASE I
title_fullStr EVALUATION AND RETROFITTING WATER TREATMENT PLANT OF METROPOLITAN DRINKING WATER SUPPLY SYSTEM SOUTH BANDUNG REGION PHASE I
title_full_unstemmed EVALUATION AND RETROFITTING WATER TREATMENT PLANT OF METROPOLITAN DRINKING WATER SUPPLY SYSTEM SOUTH BANDUNG REGION PHASE I
title_sort evaluation and retrofitting water treatment plant of metropolitan drinking water supply system south bandung region phase i
url https://digilib.itb.ac.id/gdl/view/43104
_version_ 1822270287482191872