THE PROPOSED PROCEDURE FOR PROCESS CONTROL IN PT. DIRGANTARA INDONESIA

PT. Dirgantara Indonesia is a state-owned company that manufactures aircraft. PT. Dirgantara Indonesia is a second-tier supplier for Airbus and wants to become a first-tier supplier. To achieve this goal, PT. Dirgantara Indonesia must apply statistical process control (SPC) on its shop floor. SPC wi...

Full description

Saved in:
Bibliographic Details
Main Author: DEWANI PRABANDARI, LINTANG
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43173
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43173
spelling id-itb.:431732019-09-26T08:17:57ZTHE PROPOSED PROCEDURE FOR PROCESS CONTROL IN PT. DIRGANTARA INDONESIA DEWANI PRABANDARI, LINTANG Indonesia Final Project control chart, OCAP, EMWA, ABST-II, procedure INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43173 PT. Dirgantara Indonesia is a state-owned company that manufactures aircraft. PT. Dirgantara Indonesia is a second-tier supplier for Airbus and wants to become a first-tier supplier. To achieve this goal, PT. Dirgantara Indonesia must apply statistical process control (SPC) on its shop floor. SPC will be applied in activating before supplementary type II process (ABST-II) on steel line production in Surface Treatment Department in the form of control chart and out-of-control action plan (OCAP). This research is aimed to design control chart and its procedure for ABST-II process along with design OCAP and its procedure. The research’s methodology consists of preliminary study, data collection and processing, analysis, and conclusion. Process’ key characteristic for ABST-II is the concentration of sulfuric acid’s solution. Concentration’s data will be collected from laboratory. Exponentially weighted moving average control chart (EWMA) is selected to be used in this research and generated using Minitab. Identification for nonrandom pattern in control chart will be done using zone rules to find out whether the process is in out-of-control condition. If ABST-II process in in out-of-control condition then root cause analysis will be done to find out the cause for out-of-control condition. Root cause analysis will be done using 5Whys and illustrated in cause-and-effect diagram. The result of root cause analysis will be the checkpoints in OCAP. The procedure for control chart and OCAP is designed according to data processing steps and PT. Dirgantara Indonesia’s procedure. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT. Dirgantara Indonesia is a state-owned company that manufactures aircraft. PT. Dirgantara Indonesia is a second-tier supplier for Airbus and wants to become a first-tier supplier. To achieve this goal, PT. Dirgantara Indonesia must apply statistical process control (SPC) on its shop floor. SPC will be applied in activating before supplementary type II process (ABST-II) on steel line production in Surface Treatment Department in the form of control chart and out-of-control action plan (OCAP). This research is aimed to design control chart and its procedure for ABST-II process along with design OCAP and its procedure. The research’s methodology consists of preliminary study, data collection and processing, analysis, and conclusion. Process’ key characteristic for ABST-II is the concentration of sulfuric acid’s solution. Concentration’s data will be collected from laboratory. Exponentially weighted moving average control chart (EWMA) is selected to be used in this research and generated using Minitab. Identification for nonrandom pattern in control chart will be done using zone rules to find out whether the process is in out-of-control condition. If ABST-II process in in out-of-control condition then root cause analysis will be done to find out the cause for out-of-control condition. Root cause analysis will be done using 5Whys and illustrated in cause-and-effect diagram. The result of root cause analysis will be the checkpoints in OCAP. The procedure for control chart and OCAP is designed according to data processing steps and PT. Dirgantara Indonesia’s procedure.
format Final Project
author DEWANI PRABANDARI, LINTANG
spellingShingle DEWANI PRABANDARI, LINTANG
THE PROPOSED PROCEDURE FOR PROCESS CONTROL IN PT. DIRGANTARA INDONESIA
author_facet DEWANI PRABANDARI, LINTANG
author_sort DEWANI PRABANDARI, LINTANG
title THE PROPOSED PROCEDURE FOR PROCESS CONTROL IN PT. DIRGANTARA INDONESIA
title_short THE PROPOSED PROCEDURE FOR PROCESS CONTROL IN PT. DIRGANTARA INDONESIA
title_full THE PROPOSED PROCEDURE FOR PROCESS CONTROL IN PT. DIRGANTARA INDONESIA
title_fullStr THE PROPOSED PROCEDURE FOR PROCESS CONTROL IN PT. DIRGANTARA INDONESIA
title_full_unstemmed THE PROPOSED PROCEDURE FOR PROCESS CONTROL IN PT. DIRGANTARA INDONESIA
title_sort proposed procedure for process control in pt. dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/43173
_version_ 1822926500144349184