Risk Management Planning of FTTH Huawei-XL Telecommunication Network Project in PT Maju Jaya Teknologi

PT Maju Jaya Teknologi (Majatek) is a company engaged in telecommunications network infrastructure. PT Majatek is currently in the process of cooperation on a project with Huawei. One of the requirements from Huawei is the availability of risk management document. The existing risk management docume...

Full description

Saved in:
Bibliographic Details
Main Author: AFIFAH, KHAIRUNNISA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43192
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43192
spelling id-itb.:431922019-09-26T09:18:51ZRisk Management Planning of FTTH Huawei-XL Telecommunication Network Project in PT Maju Jaya Teknologi AFIFAH, KHAIRUNNISA Indonesia Final Project WBS, RBS, HAZOP, probability and impact matrices, and Monte Carlo. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43192 PT Maju Jaya Teknologi (Majatek) is a company engaged in telecommunications network infrastructure. PT Majatek is currently in the process of cooperation on a project with Huawei. One of the requirements from Huawei is the availability of risk management document. The existing risk management documents are not regularly updated. Risk identification in risk management also only covers certain processes that are considered important. The success of the project itself shows failure such as schedule setbacks. To solve this problem, risk management was carried out for one of the Majatek projects, the Huawei-XL FTTH telecommunications network project. Risk management in this study followed the stages of risk management in the Project Management Book of Knowledge (PMBoK). Risk management started with a risk management plan consisting of data collection, the formulation of a Work Breakdown Structure (WBS) and Risk Breakdown Structure (RBS). Risk identification was done by the HAZOP method and interviews. Furthermore, a qualitative analysis was carried out by conducting interviews and a quantitative analysis was carried out using the Monte Carlo simulation method and sensitivity analysis. The final stage was planning response for each priority risk in accordance with the PMBoK strategy. Risk identification in the project resulted 51 negative risks. From the results of qualitative analysis, it was found 7 priority risks. The results of quantitative analysis for one of the risks, the schedule setbacks, show that the likelihood of the project is completed according to the normal duration, which is 50 days, is 55%. Risk response strategies for this risk are improve planning for HR, materials, tools, costs targets, and schedules. Sensitivity analysis showed that the sequence of activities with the greatest sensitivity to completion time was project work, material purchases, project handover, and project planning. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Maju Jaya Teknologi (Majatek) is a company engaged in telecommunications network infrastructure. PT Majatek is currently in the process of cooperation on a project with Huawei. One of the requirements from Huawei is the availability of risk management document. The existing risk management documents are not regularly updated. Risk identification in risk management also only covers certain processes that are considered important. The success of the project itself shows failure such as schedule setbacks. To solve this problem, risk management was carried out for one of the Majatek projects, the Huawei-XL FTTH telecommunications network project. Risk management in this study followed the stages of risk management in the Project Management Book of Knowledge (PMBoK). Risk management started with a risk management plan consisting of data collection, the formulation of a Work Breakdown Structure (WBS) and Risk Breakdown Structure (RBS). Risk identification was done by the HAZOP method and interviews. Furthermore, a qualitative analysis was carried out by conducting interviews and a quantitative analysis was carried out using the Monte Carlo simulation method and sensitivity analysis. The final stage was planning response for each priority risk in accordance with the PMBoK strategy. Risk identification in the project resulted 51 negative risks. From the results of qualitative analysis, it was found 7 priority risks. The results of quantitative analysis for one of the risks, the schedule setbacks, show that the likelihood of the project is completed according to the normal duration, which is 50 days, is 55%. Risk response strategies for this risk are improve planning for HR, materials, tools, costs targets, and schedules. Sensitivity analysis showed that the sequence of activities with the greatest sensitivity to completion time was project work, material purchases, project handover, and project planning.
format Final Project
author AFIFAH, KHAIRUNNISA
spellingShingle AFIFAH, KHAIRUNNISA
Risk Management Planning of FTTH Huawei-XL Telecommunication Network Project in PT Maju Jaya Teknologi
author_facet AFIFAH, KHAIRUNNISA
author_sort AFIFAH, KHAIRUNNISA
title Risk Management Planning of FTTH Huawei-XL Telecommunication Network Project in PT Maju Jaya Teknologi
title_short Risk Management Planning of FTTH Huawei-XL Telecommunication Network Project in PT Maju Jaya Teknologi
title_full Risk Management Planning of FTTH Huawei-XL Telecommunication Network Project in PT Maju Jaya Teknologi
title_fullStr Risk Management Planning of FTTH Huawei-XL Telecommunication Network Project in PT Maju Jaya Teknologi
title_full_unstemmed Risk Management Planning of FTTH Huawei-XL Telecommunication Network Project in PT Maju Jaya Teknologi
title_sort risk management planning of ftth huawei-xl telecommunication network project in pt maju jaya teknologi
url https://digilib.itb.ac.id/gdl/view/43192
_version_ 1821998810117701632