THE PROPOSED DESIGN OF ASSEMBLY LINE TAIL UNIT CN235 AT PT DIRGANTARA INDONESIA
CN235 is one of PT Dirgantara Indonesia's high demand aircraft products. PT DI estimates that CN235’s demand will increase to 6 units a year. However, the current production capacity of CN235, specifically the major subassembly tail unit, is only 3 units a year. CN235 production speed highly de...
Saved in:
Main Author: | MELINDA SITORUS, GRACE |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43201 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
by: SEKAR ROSANIA - (13413046), NURIFFA -
OUTER WING OF PT DIRGANTARA INDONESIA CN-235 AIRCRAFT ASSEMBLY LINE IMPROVEMENT
by: Rosari Tambunan, Ester -
OPERATOR ASSIGNMENT DESIGN IN PANELIZED ASSEMBLY LINE OF CENTER FUSELAGE CN235 AT PT DIRGANTARA INDONESIA
by: Uli Agnes Monica Gultom, Shinta -
METHODOLOGY FOR OPERATION STANDARD TIME ADJUSTMENT IN FINAL ASSEMBLY LINE CN235 DIVISION PT DIRGANTARA INDONESIA
by: Immanuel, Evelyn -
SIMULTANEOUS ASSEMBLY LINE DESIGN AND WORKFORCE SCHEDULING IN CN-235 AIRCRAFT FINAL ASSEMBLY LINE OF INDONESIA AEROSPACE COMPANY
by: RIZQULLAH NIM 13414018, NAUFAL