SYSTEM DYNAMIC APPLICATION IN ESTIMATING PRODUCTION LEVEL AND PROVIDING INCENTIVES FOR PINE OLEORESIN TAPPERS AT KPH BANDUNG UTARA

KPH Bandung Utara Perum Perhutani Unit III Jawa Barat dan Banten is one of the producers of pine oleoresin that faced low target production problems despite its potential. The aim of this study is to determine the incentive model and strategy using dynamic system in order to increase pine oleoresin...

Full description

Saved in:
Bibliographic Details
Main Author: Okkianty Yudha, Rizdha
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43232
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43232
spelling id-itb.:432322019-09-26T11:13:51ZSYSTEM DYNAMIC APPLICATION IN ESTIMATING PRODUCTION LEVEL AND PROVIDING INCENTIVES FOR PINE OLEORESIN TAPPERS AT KPH BANDUNG UTARA Okkianty Yudha, Rizdha Indonesia Theses Pinus merkusii, system dynamic models, pine oleoresin, incentives, KPH Bandung Utara INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43232 KPH Bandung Utara Perum Perhutani Unit III Jawa Barat dan Banten is one of the producers of pine oleoresin that faced low target production problems despite its potential. The aim of this study is to determine the incentive model and strategy using dynamic system in order to increase pine oleoresin production at KPH Bandung Utara. The research data were obtained through a purposive sampling technique with 0.1 ha circular plot, in-depth interviews, and secondary data. The model is built and tested by Stella 9.02 software and MAPE for validation technique. The effect of providing incentives on the production of pine oleoresin production is tested using Wilcoxon signed rank test. The factors that affect pine resin production at KPH Bandung Utara are tapping saturation level, rain duration, slope, bearing distance, and productivity of tappers. Dynamic pine oleoresin production model consists of three submodels: the stand growth, the pine oleoresin production, and the incentive provide that can predict the value of pine resin production at KPH Bandung Utara. System dynamic models using Stella software can approach the actual value of pine oleoresin production at KPH Bandung Utara with Mean Absolute Percentage Error (MAPE) of 6.46%. The optimal providing incentive scenario is based on the bearing distance factor and productivity of tappers with effectivity of 44.98 which has succeeded in increasing the value of pine resin production by 170.39% with an increase in cost of 3.79%. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description KPH Bandung Utara Perum Perhutani Unit III Jawa Barat dan Banten is one of the producers of pine oleoresin that faced low target production problems despite its potential. The aim of this study is to determine the incentive model and strategy using dynamic system in order to increase pine oleoresin production at KPH Bandung Utara. The research data were obtained through a purposive sampling technique with 0.1 ha circular plot, in-depth interviews, and secondary data. The model is built and tested by Stella 9.02 software and MAPE for validation technique. The effect of providing incentives on the production of pine oleoresin production is tested using Wilcoxon signed rank test. The factors that affect pine resin production at KPH Bandung Utara are tapping saturation level, rain duration, slope, bearing distance, and productivity of tappers. Dynamic pine oleoresin production model consists of three submodels: the stand growth, the pine oleoresin production, and the incentive provide that can predict the value of pine resin production at KPH Bandung Utara. System dynamic models using Stella software can approach the actual value of pine oleoresin production at KPH Bandung Utara with Mean Absolute Percentage Error (MAPE) of 6.46%. The optimal providing incentive scenario is based on the bearing distance factor and productivity of tappers with effectivity of 44.98 which has succeeded in increasing the value of pine resin production by 170.39% with an increase in cost of 3.79%.
format Theses
author Okkianty Yudha, Rizdha
spellingShingle Okkianty Yudha, Rizdha
SYSTEM DYNAMIC APPLICATION IN ESTIMATING PRODUCTION LEVEL AND PROVIDING INCENTIVES FOR PINE OLEORESIN TAPPERS AT KPH BANDUNG UTARA
author_facet Okkianty Yudha, Rizdha
author_sort Okkianty Yudha, Rizdha
title SYSTEM DYNAMIC APPLICATION IN ESTIMATING PRODUCTION LEVEL AND PROVIDING INCENTIVES FOR PINE OLEORESIN TAPPERS AT KPH BANDUNG UTARA
title_short SYSTEM DYNAMIC APPLICATION IN ESTIMATING PRODUCTION LEVEL AND PROVIDING INCENTIVES FOR PINE OLEORESIN TAPPERS AT KPH BANDUNG UTARA
title_full SYSTEM DYNAMIC APPLICATION IN ESTIMATING PRODUCTION LEVEL AND PROVIDING INCENTIVES FOR PINE OLEORESIN TAPPERS AT KPH BANDUNG UTARA
title_fullStr SYSTEM DYNAMIC APPLICATION IN ESTIMATING PRODUCTION LEVEL AND PROVIDING INCENTIVES FOR PINE OLEORESIN TAPPERS AT KPH BANDUNG UTARA
title_full_unstemmed SYSTEM DYNAMIC APPLICATION IN ESTIMATING PRODUCTION LEVEL AND PROVIDING INCENTIVES FOR PINE OLEORESIN TAPPERS AT KPH BANDUNG UTARA
title_sort system dynamic application in estimating production level and providing incentives for pine oleoresin tappers at kph bandung utara
url https://digilib.itb.ac.id/gdl/view/43232
_version_ 1821998820881334272