WORKER REQUIREMENT ANALYSIS OF CENTER FUSELAGE PANELIZATION SYSTEM IN CN-235 AIRCRAFT PT DIRGANTARA INDONESIA

PT Dirgantara Indonesia is a state-owned company that runs an aircraft production business. CN-235 is one of type plane with high demand which is 6 units per year with takt time value of 2 months. In actual conditions, PT DI can only procudes 4 units of aircraft in a year so company must pay a penal...

Full description

Saved in:
Bibliographic Details
Main Author: AYU KUSUMA WARDANI, LINDA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43263
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first