WORKER REQUIREMENT ANALYSIS OF CENTER FUSELAGE PANELIZATION SYSTEM IN CN-235 AIRCRAFT PT DIRGANTARA INDONESIA
PT Dirgantara Indonesia is a state-owned company that runs an aircraft production business. CN-235 is one of type plane with high demand which is 6 units per year with takt time value of 2 months. In actual conditions, PT DI can only procudes 4 units of aircraft in a year so company must pay a penal...
Saved in:
Main Author: | AYU KUSUMA WARDANI, LINDA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43263 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPERATOR ASSIGNMENT DESIGN IN PANELIZED ASSEMBLY LINE OF CENTER FUSELAGE CN235 AT PT DIRGANTARA INDONESIA
by: Uli Agnes Monica Gultom, Shinta -
OUTER WING OF PT DIRGANTARA INDONESIA CN-235 AIRCRAFT ASSEMBLY LINE IMPROVEMENT
by: Rosari Tambunan, Ester -
THE PROPOSED DESIGN OF ASSEMBLY LINE TAIL UNIT CN235 AT PT DIRGANTARA INDONESIA
by: MELINDA SITORUS, GRACE -
DAMAGE TOLERANCE ANALYSIS FOR MULTIPLE SITE DAMAGE LAP JOINT FUSELAGE CN 235 WITH PROBABILISTIC METHOD
by: EDY PRASETYO (NIM : 23607025); Pembimbing 1 : Prof. Dr. Ichsan Setya Putra; Pembimbing 2 : Dr, EKO -
WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA
by: Arya Amaviska, Adrian