PERENCANAAN LAYOUT LADANG PEMBANGKIT LISTRIK TENAGA ARUS PASANG SURUT DI SELAT WAWONII, SULAWESI TENGGARA
Wawonii Strait at Sulawesi Tenggara has a potential as tidal current power plant field becaus it has a large current speed. Sulawesi Tenggara itself is the fourth province with the lowest electrification ratio. Therefore a potential study and design of the power plant field will be conducted in Wawo...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43298 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |