OCCUPATIONAL SAFETY AND HEALTH RISK MANAGEMENT IN FLY OVER CONSTRUCTION PROJECT CIBEUREUM SUKABUMI AT DINAS BINA MARGA PROVINSI JAWA BARAT USING HIRAC METHOD

Dinas Bina Marga Provinsi Jawa Barat is a part of Pemerintah Daerah Provinsi Jawa Barat under Kementerian Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia. As an effort to equalize regional distribution, Dinas Bina Marga Provinsi Jawa Barat intended to build a flyover bridge. But, in the const...

Full description

Saved in:
Bibliographic Details
Main Author: Kiranamahsa, Saskia
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43399
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43399
spelling id-itb.:433992019-09-27T07:53:25ZOCCUPATIONAL SAFETY AND HEALTH RISK MANAGEMENT IN FLY OVER CONSTRUCTION PROJECT CIBEUREUM SUKABUMI AT DINAS BINA MARGA PROVINSI JAWA BARAT USING HIRAC METHOD Kiranamahsa, Saskia Indonesia Final Project Risk management, OH&S, HIRAC, Construction project, hazard INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43399 Dinas Bina Marga Provinsi Jawa Barat is a part of Pemerintah Daerah Provinsi Jawa Barat under Kementerian Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia. As an effort to equalize regional distribution, Dinas Bina Marga Provinsi Jawa Barat intended to build a flyover bridge. But, in the construction process of the flyover bridge, accidents often occur. In an effort to reduce the accidents risk, Dinas Bina Marga Provinsi Jawa Barat is required to pay attention to the organization of Occupational Health & Safety Management System (OH&S) in accordance with Peraturan Menteri Pekerjaan Umum Nomor 05/PRT/M/2014 where the document’s risk management needs to be improved in term of Occupational Health & Safety (OH&S). In the risks management in term of OH&S, Hazard Identification and Risk Assessment and Control (HIRAC) is used, referring to Peraturan Menteri Pekerjaan Umum Nomor 05/PRT/M/2014 about Pedoman Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Konstruksi Bidang Pekerjaan Umum and ISO 31000 Framework on Risks Management. The process was started with WBS mapping, risk identification by using literature study and checklist, risk assessment by using RII, critical risk selection by using REV, and risk response proposal. Based on 170 level 4 WBS’, 505 risks were identified. Based on the results of risk assessment, 26 risks were classified as high risk, 161 risks were classified as medium risks, and 19 risks were classified as low risk. 26 risks became the priority in the risk response proposal organization which is grouped next into 9 critical risks. The risk response proposal organization was done by using hierarchy of control method consisting of elimination, substitution, technical control, administrative control, and Personal Protective Equipment (PPE). text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Dinas Bina Marga Provinsi Jawa Barat is a part of Pemerintah Daerah Provinsi Jawa Barat under Kementerian Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia. As an effort to equalize regional distribution, Dinas Bina Marga Provinsi Jawa Barat intended to build a flyover bridge. But, in the construction process of the flyover bridge, accidents often occur. In an effort to reduce the accidents risk, Dinas Bina Marga Provinsi Jawa Barat is required to pay attention to the organization of Occupational Health & Safety Management System (OH&S) in accordance with Peraturan Menteri Pekerjaan Umum Nomor 05/PRT/M/2014 where the document’s risk management needs to be improved in term of Occupational Health & Safety (OH&S). In the risks management in term of OH&S, Hazard Identification and Risk Assessment and Control (HIRAC) is used, referring to Peraturan Menteri Pekerjaan Umum Nomor 05/PRT/M/2014 about Pedoman Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Konstruksi Bidang Pekerjaan Umum and ISO 31000 Framework on Risks Management. The process was started with WBS mapping, risk identification by using literature study and checklist, risk assessment by using RII, critical risk selection by using REV, and risk response proposal. Based on 170 level 4 WBS’, 505 risks were identified. Based on the results of risk assessment, 26 risks were classified as high risk, 161 risks were classified as medium risks, and 19 risks were classified as low risk. 26 risks became the priority in the risk response proposal organization which is grouped next into 9 critical risks. The risk response proposal organization was done by using hierarchy of control method consisting of elimination, substitution, technical control, administrative control, and Personal Protective Equipment (PPE).
format Final Project
author Kiranamahsa, Saskia
spellingShingle Kiranamahsa, Saskia
OCCUPATIONAL SAFETY AND HEALTH RISK MANAGEMENT IN FLY OVER CONSTRUCTION PROJECT CIBEUREUM SUKABUMI AT DINAS BINA MARGA PROVINSI JAWA BARAT USING HIRAC METHOD
author_facet Kiranamahsa, Saskia
author_sort Kiranamahsa, Saskia
title OCCUPATIONAL SAFETY AND HEALTH RISK MANAGEMENT IN FLY OVER CONSTRUCTION PROJECT CIBEUREUM SUKABUMI AT DINAS BINA MARGA PROVINSI JAWA BARAT USING HIRAC METHOD
title_short OCCUPATIONAL SAFETY AND HEALTH RISK MANAGEMENT IN FLY OVER CONSTRUCTION PROJECT CIBEUREUM SUKABUMI AT DINAS BINA MARGA PROVINSI JAWA BARAT USING HIRAC METHOD
title_full OCCUPATIONAL SAFETY AND HEALTH RISK MANAGEMENT IN FLY OVER CONSTRUCTION PROJECT CIBEUREUM SUKABUMI AT DINAS BINA MARGA PROVINSI JAWA BARAT USING HIRAC METHOD
title_fullStr OCCUPATIONAL SAFETY AND HEALTH RISK MANAGEMENT IN FLY OVER CONSTRUCTION PROJECT CIBEUREUM SUKABUMI AT DINAS BINA MARGA PROVINSI JAWA BARAT USING HIRAC METHOD
title_full_unstemmed OCCUPATIONAL SAFETY AND HEALTH RISK MANAGEMENT IN FLY OVER CONSTRUCTION PROJECT CIBEUREUM SUKABUMI AT DINAS BINA MARGA PROVINSI JAWA BARAT USING HIRAC METHOD
title_sort occupational safety and health risk management in fly over construction project cibeureum sukabumi at dinas bina marga provinsi jawa barat using hirac method
url https://digilib.itb.ac.id/gdl/view/43399
_version_ 1821998864584933376