As the electricity consumption in Indonesia increases, the Government plans to expand the power plants capacity by 56.3 Gigawatts (GWh) for the next ten years, with renewable energy power plants as the main focus. The renewable energy power plants capacity expansion creates an investment opportunity...

Full description

Saved in:
Bibliographic Details
Main Author: Mahanael Sormin, Parada
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43429
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43429
spelling id-itb.:434292019-09-27T08:56:59ZTHE DESIGN OF INVESTMENT STRATEGY FOR MINI-HYDROPOWER PROJECT USING SEQUENTIAL COMPOUND OPTION MODEL (Case Study: Cikancana Mini-Hydropower Project) Mahanael Sormin, Parada Indonesia Final Project minihydro power plant, marketed asset disclaimer (MAD), net present value (NPV), real option, sequential compound option INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43429 As the electricity consumption in Indonesia increases, the Government plans to expand the power plants capacity by 56.3 Gigawatts (GWh) for the next ten years, with renewable energy power plants as the main focus. The renewable energy power plants capacity expansion creates an investment opportunity for companies to participate in the electricity provision in Indonesia. PT Cahaya Kancana Nusantara intends to participate in Indonesia’s electricity provisions by initiating Cikancana mini-hydropower plant. The company has done the optimization study to analyze the project’s financial feasibility. However, that study hasn’t considered the uncertainty factors that might be faced by the project, so that investors haven’t had any investment strategy to face the uncertainties. This study aims to build an investment strategy for Cikancana mini-hydropower plant, so the investment could be done in the right way. The investment strategy is built with the real option concept, which marketed asset disclaimer (MAD) will be used in this study. The discounted cash flow analysis is performed to calculate the base net present value (NPV) and the value of the project. The electricity tariff, the number of energy produced, and the operation and maintenance cost are the key variables which will be utilized as the uncertainty factors that could affect the project’s cash flow performance. The mapping of asset values and option values are done with the sequential compound option model, which the investment strategy will be developed from this model. Spearman’s rank correlation coefficient is utilized to identify the most contributing variables to the project’s financial feasibility, which the value is obtained from the Monte Carlo simulation. It is found that the project’s base NPV is accounted at Rp7.874.764.905, which the project is feasible to invest based on the NPV. Based on the real options analysis, it is found that investors could only continue to invest for the next stage if the uncertainties associated with the preceded stage is disappear, so the expected benefit produced by the project exceed its investment cost, for every stage of the project. Furthermore, it is also found that the option value of the project is accounted at Rp5.899.431.809, indicates that the uncertainty factor brings negative effects to the project’s financial performance. Investors also need to take a closer look at the energy produced by the project, since this factor contributes the most to the project’s financial performance. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description As the electricity consumption in Indonesia increases, the Government plans to expand the power plants capacity by 56.3 Gigawatts (GWh) for the next ten years, with renewable energy power plants as the main focus. The renewable energy power plants capacity expansion creates an investment opportunity for companies to participate in the electricity provision in Indonesia. PT Cahaya Kancana Nusantara intends to participate in Indonesia’s electricity provisions by initiating Cikancana mini-hydropower plant. The company has done the optimization study to analyze the project’s financial feasibility. However, that study hasn’t considered the uncertainty factors that might be faced by the project, so that investors haven’t had any investment strategy to face the uncertainties. This study aims to build an investment strategy for Cikancana mini-hydropower plant, so the investment could be done in the right way. The investment strategy is built with the real option concept, which marketed asset disclaimer (MAD) will be used in this study. The discounted cash flow analysis is performed to calculate the base net present value (NPV) and the value of the project. The electricity tariff, the number of energy produced, and the operation and maintenance cost are the key variables which will be utilized as the uncertainty factors that could affect the project’s cash flow performance. The mapping of asset values and option values are done with the sequential compound option model, which the investment strategy will be developed from this model. Spearman’s rank correlation coefficient is utilized to identify the most contributing variables to the project’s financial feasibility, which the value is obtained from the Monte Carlo simulation. It is found that the project’s base NPV is accounted at Rp7.874.764.905, which the project is feasible to invest based on the NPV. Based on the real options analysis, it is found that investors could only continue to invest for the next stage if the uncertainties associated with the preceded stage is disappear, so the expected benefit produced by the project exceed its investment cost, for every stage of the project. Furthermore, it is also found that the option value of the project is accounted at Rp5.899.431.809, indicates that the uncertainty factor brings negative effects to the project’s financial performance. Investors also need to take a closer look at the energy produced by the project, since this factor contributes the most to the project’s financial performance.
format Final Project
author Mahanael Sormin, Parada
spellingShingle Mahanael Sormin, Parada
THE DESIGN OF INVESTMENT STRATEGY FOR MINI-HYDROPOWER PROJECT USING SEQUENTIAL COMPOUND OPTION MODEL (Case Study: Cikancana Mini-Hydropower Project)
author_facet Mahanael Sormin, Parada
author_sort Mahanael Sormin, Parada
title THE DESIGN OF INVESTMENT STRATEGY FOR MINI-HYDROPOWER PROJECT USING SEQUENTIAL COMPOUND OPTION MODEL (Case Study: Cikancana Mini-Hydropower Project)
title_short THE DESIGN OF INVESTMENT STRATEGY FOR MINI-HYDROPOWER PROJECT USING SEQUENTIAL COMPOUND OPTION MODEL (Case Study: Cikancana Mini-Hydropower Project)
title_full THE DESIGN OF INVESTMENT STRATEGY FOR MINI-HYDROPOWER PROJECT USING SEQUENTIAL COMPOUND OPTION MODEL (Case Study: Cikancana Mini-Hydropower Project)
title_fullStr THE DESIGN OF INVESTMENT STRATEGY FOR MINI-HYDROPOWER PROJECT USING SEQUENTIAL COMPOUND OPTION MODEL (Case Study: Cikancana Mini-Hydropower Project)
title_full_unstemmed THE DESIGN OF INVESTMENT STRATEGY FOR MINI-HYDROPOWER PROJECT USING SEQUENTIAL COMPOUND OPTION MODEL (Case Study: Cikancana Mini-Hydropower Project)
title_sort design of investment strategy for mini-hydropower project using sequential compound option model (case study: cikancana mini-hydropower project)
url https://digilib.itb.ac.id/gdl/view/43429
_version_ 1822926576224829440