THE DESIGN OF INVESTMENT STRATEGY FOR MINI-HYDROPOWER PROJECT USING SEQUENTIAL COMPOUND OPTION MODEL (Case Study: Cikancana Mini-Hydropower Project)
As the electricity consumption in Indonesia increases, the Government plans to expand the power plants capacity by 56.3 Gigawatts (GWh) for the next ten years, with renewable energy power plants as the main focus. The renewable energy power plants capacity expansion creates an investment opportunity...
Saved in:
Main Author: | Mahanael Sormin, Parada |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43429 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BASIC DESIGN OF MINI HYDROPOWER WAY ELA, MALUKU
by: SANJAYA , YONGKY -
FINANCING STRATEGY FOR ENCHANCE BUSINESS VALUE OF CIKANCANA MINI HYDRO POWWER PLANT PROJECT
by: Lintangcahya M, Avique -
MINI HYDROPOWER PLANT PLANNING AT SUBDAS CIWIDEY-CUKANGGENTENG
by: TAJRI, RUZIQU -
PLANNING OF AEK RAMBEâS MINI HYDROPOWER PLANT IN THE PROVINCE OF NORTH SUMATERA
by: Syah Barran Roesbianto, Azman -
PENSTOCK PIPE DIMENSION DESIGN CASE STUDY : PENSTOCK PIPE FOR KAMBANGAN 5 MW MINI HYDROPOWER.
by: Ikbar Wiranto, Wisnu