Design and Numerical Simulation of Cross Flow Water Turbine at Net Head 30 m with Maximum Discharge 0.527 m 3 /s
Indonesia is an archipelago country with large number of population and increasing demand of electricity every year. The fulfilment of the electricity needs is still obstructed in several areas outside of PLN electricity grids, causing low electrification ratio in such place even though they hav...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43541 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!