HEAT RATE GAP ANALYSIS BASED ON EPRI AND HEAT BALANCE METHOD (CASE STUDY in PLTU OMBILIN 2 X 100 MW)

The performance of power plant will begin to decrease with increasing operating hours of power plant. PLTU Ombilin is one of the power plant that was established to strengthen the electricity system in the central part of sumatra and has been operating for more than 20 years so that the performan...

Full description

Saved in:
Bibliographic Details
Main Author: Daniel Sihaloho, Ridho
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43552
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia