HEAT RATE GAP ANALYSIS BASED ON EPRI AND HEAT BALANCE METHOD (CASE STUDY in PLTU OMBILIN 2 X 100 MW)
The performance of power plant will begin to decrease with increasing operating hours of power plant. PLTU Ombilin is one of the power plant that was established to strengthen the electricity system in the central part of sumatra and has been operating for more than 20 years so that the performan...
Saved in:
Main Author: | Daniel Sihaloho, Ridho |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43552 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BLOWDOWN BOILER MASS FLOW SIMULATION IN MAINTAINING RELIABILITY AND EFFICIENCY OF COAL FIRED STEAM POWER PLANT (CASE STUDY IN PLTU OMBILIN 2 X 100 MW)
by: Sefriadi, Odi -
HEAT RATE GAP ANALYSIS ON STEAM POWER PLANT CAPACITY 220 MW
by: Adhi Kuncoro, Mahendra -
BLOWDOWN HEAT ENERGY RECOVERY OF CIRCULATING FLUIDIZED BED BOILER IN PLTU 60 MW CAPACITY
by: Meidasari, Memey -
PERANCANGAN POMPA PENDINGIN KONDENSOR UNTUK PLTU 300 MW
by: , MUHAMMAD YUSUF YAHYA, et al.
Published: (2013) -
ANALYSIS OF THERMAL ON A SEAWATER-COOLED CONDENSOR AT PLTU 2 X 12.5 MW FOR LEAKAGE AND PIPE PLUGGING CASES.
by: Anglomas, Sandy