USULAN KEBIJAKAN PEMELIHARAAN PADA KOMPONEN KRITIS PLTU X

PLTU X is one of the largest power plants in its city with a capacity of 660 MW. The operational system of the PLTU unit is classified into specific areas and components, each of which has a corrective maintenance system. Maintenance activities affect downtime, availability loss, maintenance cost...

Full description

Saved in:
Bibliographic Details
Main Author: Syahzada Achmad, Galih
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/81333
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia