USULAN KEBIJAKAN PEMELIHARAAN PADA KOMPONEN KRITIS PLTU X
PLTU X is one of the largest power plants in its city with a capacity of 660 MW. The operational system of the PLTU unit is classified into specific areas and components, each of which has a corrective maintenance system. Maintenance activities affect downtime, availability loss, maintenance cost...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81334 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |