EVALUATION OF TRANSPORTATION SERVICES PRODUCTION COSTS OF DAMRI TRANS BANDUNG RAYA BUS (CASE STUDY : DIPATIUKUR – LEUWIPANJANG CORRIDOR)

The transportation services production costs are the total costs incurred for the process of providing transportation services. This costs are different with the vehicle operating costs. The transportation services production costs for Damri Trans Bandung Raya Bus, Dipatiukur – Leuwipanjang corridor...

Full description

Saved in:
Bibliographic Details
Main Author: Chandra, Aditya
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43661
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43661
spelling id-itb.:436612019-09-27T15:54:18ZEVALUATION OF TRANSPORTATION SERVICES PRODUCTION COSTS OF DAMRI TRANS BANDUNG RAYA BUS (CASE STUDY : DIPATIUKUR – LEUWIPANJANG CORRIDOR) Chandra, Aditya Indonesia Final Project transportation services production costs, Damri Trans Bandung Raya Bus, fluctuation of dollar exchange rate. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43661 The transportation services production costs are the total costs incurred for the process of providing transportation services. This costs are different with the vehicle operating costs. The transportation services production costs for Damri Trans Bandung Raya Bus, Dipatiukur – Leuwipanjang corridor has several components such as direct fixed costs, direct variable costs, indirect fixed costs, and indirect variable costs. There are several parts of direct variable costs that are sensitive to the fluctuation of dollar exchange rate and affect the transportation services production costs. In this study, besides evaluating the transportation services production costs based on the field data, it will also evaluating the transportation services production costs based on market price data for the period of June 2019, January 2019, and October 2018 which refers to the fluctuation dollar exchange rate in that period. It was found that the amount of the transportation services production costs for the field data is Rp. 13.862,92 / bus-km and for the market prices data for the period of June 2019, January 2019, and October 2018 each is equal to Rp. 14.013,16 / bus-km, Rp. 13.987,56 / bus-km, dan Rp. 14.260,25 / bus-km. It was also found that not all components of transportation services production costs have changed in line with the fluctuation dollar exchange rate. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The transportation services production costs are the total costs incurred for the process of providing transportation services. This costs are different with the vehicle operating costs. The transportation services production costs for Damri Trans Bandung Raya Bus, Dipatiukur – Leuwipanjang corridor has several components such as direct fixed costs, direct variable costs, indirect fixed costs, and indirect variable costs. There are several parts of direct variable costs that are sensitive to the fluctuation of dollar exchange rate and affect the transportation services production costs. In this study, besides evaluating the transportation services production costs based on the field data, it will also evaluating the transportation services production costs based on market price data for the period of June 2019, January 2019, and October 2018 which refers to the fluctuation dollar exchange rate in that period. It was found that the amount of the transportation services production costs for the field data is Rp. 13.862,92 / bus-km and for the market prices data for the period of June 2019, January 2019, and October 2018 each is equal to Rp. 14.013,16 / bus-km, Rp. 13.987,56 / bus-km, dan Rp. 14.260,25 / bus-km. It was also found that not all components of transportation services production costs have changed in line with the fluctuation dollar exchange rate.
format Final Project
author Chandra, Aditya
spellingShingle Chandra, Aditya
EVALUATION OF TRANSPORTATION SERVICES PRODUCTION COSTS OF DAMRI TRANS BANDUNG RAYA BUS (CASE STUDY : DIPATIUKUR – LEUWIPANJANG CORRIDOR)
author_facet Chandra, Aditya
author_sort Chandra, Aditya
title EVALUATION OF TRANSPORTATION SERVICES PRODUCTION COSTS OF DAMRI TRANS BANDUNG RAYA BUS (CASE STUDY : DIPATIUKUR – LEUWIPANJANG CORRIDOR)
title_short EVALUATION OF TRANSPORTATION SERVICES PRODUCTION COSTS OF DAMRI TRANS BANDUNG RAYA BUS (CASE STUDY : DIPATIUKUR – LEUWIPANJANG CORRIDOR)
title_full EVALUATION OF TRANSPORTATION SERVICES PRODUCTION COSTS OF DAMRI TRANS BANDUNG RAYA BUS (CASE STUDY : DIPATIUKUR – LEUWIPANJANG CORRIDOR)
title_fullStr EVALUATION OF TRANSPORTATION SERVICES PRODUCTION COSTS OF DAMRI TRANS BANDUNG RAYA BUS (CASE STUDY : DIPATIUKUR – LEUWIPANJANG CORRIDOR)
title_full_unstemmed EVALUATION OF TRANSPORTATION SERVICES PRODUCTION COSTS OF DAMRI TRANS BANDUNG RAYA BUS (CASE STUDY : DIPATIUKUR – LEUWIPANJANG CORRIDOR)
title_sort evaluation of transportation services production costs of damri trans bandung raya bus (case study : dipatiukur – leuwipanjang corridor)
url https://digilib.itb.ac.id/gdl/view/43661
_version_ 1822926644087619584