Exergoeconomic Study of a Combined Flash-Binary Cycle at Dieng Unit 2 Geothermal Power Plant
Indonesia has vast potential of geothermal energy. In order to meet future electricity demands, PLN has plans to increase the provision of geothermal power plants. Past research has shown that a combined flash-binary cycle geothermal power plant is proven to increase the thermodynamic performanc...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/43732 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |