Exergoeconomic Study of a Combined Flash-Binary Cycle at Dieng Unit 2 Geothermal Power Plant
Indonesia has vast potential of geothermal energy. In order to meet future electricity demands, PLN has plans to increase the provision of geothermal power plants. Past research has shown that a combined flash-binary cycle geothermal power plant is proven to increase the thermodynamic performanc...
Saved in:
Main Author: | Theophilus, Jason |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43732 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Exergoeconomic Study of a Combined Flash-Binary Cycle at Dieng Unit 2 Geothermal Power Plant
by: Theophilus, Jason -
THE APPLICATION OF BINARY CYCLE ON DIENG GEOTHERMAL POWER PLANT BY COMBINING SINGLE FLASH SYSTEM AND ORGANIC RANKINE CYCLE
by: Ekalaya Yusuf, Daud -
THERMODYNAMICS STUDY OF FLASH-BINARY CYCLE IN THE LAHENDONG GEOTHERMAL POWER PLANT
by: GUNAWAN (NIM : 13106008); Pembimbing 1 : Dr. Ir. Ari Darmawan Pasek; Pembimbing 2 : Prof. , CHRISTIAN -
Exergoeconomic analysis of a combined water and power plant
by: FAZLE MAHBUB
Published: (2010) -
Exergoeconomic analyses of a Combined Water and Power Plant (CWPP)
by: Mahbub, F., et al.
Published: (2014)