Productivity Increment at PT INKA Pemasangan Komponen Bogie Workshop
Pemasangan Komponen (PMK) Bogie workshop at PT INKA is a workspace on which all bogie, produced by PT INKA, is being assembled. The workshop convenes all type of bogie which arrived as a set of component and main bogie frame into a finished bogie unit. Therefore the harmonious sequence of proces...
Saved in:
Main Author: | Enji, Eugene |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43858 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF A MAINTENANCE PROGRAM FOR PT INKA'S BOGIE DIESEL ELECTRIC MULTIPLE UNIT USING RELIABILITY CENTERED MAINTENANCE II
by: Sulistyowati, Ririn -
DEVELOPMENT OF MATERIAL MONITORING SYSTEM ON BOGIE WORKSHOP WITH WEB-BASED APPLICATION
by: Setiawan, Bayu -
Mekanisme Restitusi Pajak Pertambahan Nilai (PPN) Atas Komponen Utama Kereta Api Di PT INKA (Persero)
by: Dyah Rochmatul Pitaloka
Published: (2019) -
Aerodynamic Analysis on the Nose of Sulawesi Train of PT INKA
by: Irfan, Saidina -
Aerodynamic Analysis on the Nose of Sulawesi Train of PT INKA
by: Irfan, Saidina