PENGEMBANGAN ALGORITMA PEMBUATAN TASK ASSIGNMENT PADA FINAL ASSEMBLY LINE PESAWAT NC-212i PT DIRGANTARA INDONESIA
PT Dirgantara Indonesia is the only company in Indonesia which is engaged in aeronautics. In addition to producing aircraft, the company also produces helicopters and aircraft guns. One of the company's most ordered aircrafts is the NC-212i. The demand for NC-212i in a year is six units. How...
Saved in:
Main Author: | Daniel Lt, Victor |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43914 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
by: RADITA FARIZKI, ZEIN -
RANCANGAN PENUGASAN OPERATOR PESAWAT NC-212I PADA STASIUN KERJA 1 DIVISI FINAL ASSEMBLY LINE PT DIRGANTARA INDONESIA
by: Carin Anastasya, Maria -
RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
by: Hamid, Fyrlia -
RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
by: Hamid, Fyrlia -
PROPOSED MODEL AND HEURISTIC ALGORITHM FOR NC212i FINAL ASSEMBLY LINE WORKSTATION REQUIREMENT DETERMINATION PT DIRGANTARA INDONESIA
by: Ibrahim, Linggar