FEASIBILITY STUDY OF BINARY SYSTEM AS A BOTTOMING UNIT PLTP DIENG-1

Dieng-1 geothermal power plant (PLTP) with a single flashed type of plant has been operating since 2002 with total generating capacity of 60 MW. Since operating in 2002, there has been a decline in production capacity from the plant due to problems at production wells, production facilities, and inj...

Full description

Saved in:
Bibliographic Details
Main Author: Gracia Ade Sumartha, Ayu
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43997
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia