FEASIBILITY STUDY OF BINARY SYSTEM AS A BOTTOMING UNIT PLTP DIENG-1
Dieng-1 geothermal power plant (PLTP) with a single flashed type of plant has been operating since 2002 with total generating capacity of 60 MW. Since operating in 2002, there has been a decline in production capacity from the plant due to problems at production wells, production facilities, and inj...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43997 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |