FEASIBILITY STUDY OF BINARY SYSTEM AS A BOTTOMING UNIT PLTP DIENG-1
Dieng-1 geothermal power plant (PLTP) with a single flashed type of plant has been operating since 2002 with total generating capacity of 60 MW. Since operating in 2002, there has been a decline in production capacity from the plant due to problems at production wells, production facilities, and inj...
Saved in:
Main Author: | Gracia Ade Sumartha, Ayu |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43997 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY WASTE BRINE USED OUTPUT SEPARATOR PLTP DIENG
by: Roni Hajianto, Muhamad -
KAJI PERFORMA KOMPONEN-KOMPONEN UTAMA PLTP DIENG.
by: Ramadhan, Gilang -
Recovery silika amorf dari lumpur panas bumi PLTP Dieng
by: , PURWATMOKO, R. Heri, et al.
Published: (2009) -
PERANCANGAN SISTEM PENDINGINAN BRINE PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP)
(STUDI KASUS : UNIT PRODUKSI PAD#29 PLTP PT. GEO DIPA ENERGI DIENG)
by: , PUNDY SAPUTRO, et al.
Published: (2013) -
Exergoeconomic Study of a Combined Flash-Binary Cycle at Dieng Unit 2 Geothermal Power Plant
by: Theophilus, Jason