OPTIMATION OF LOADING AND HAULING COSTS WITH THE LINEAR PROGRAM METHOD IN QUARRY Z PT. XYZ
In order to minimize loading-hauling costs and maximize production, an effective and efficient mining process is needed. At PT. XYZ Quarry Z, the mining process is still not effective and efficient, especially the loading and hauling of limestone from the front to the crusher. Therefore, in this...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/44007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!