ANALYZING EFFECTIVENESS OF BADAK LNG PREVENTIVE MAINTENANCE (PM) WORK ORDER FOR ELECTRICAL EQUIPMENT
Badak LNG is one of the largest LNG plant in the world consist of 8 trains and has been running for more than 4 decades to produce LNG and LPG. In early 2000, Badak LNG was the largest LNG producers in the world in around 22.5 MTPA and the rest of the product was LPG. There are 110,000 equipment ins...
Saved in:
Main Author: | Malik Abdillah, Anas |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/44079 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZING MAINTENANCE STRATEGY OF STATIC EQUIPMENT USING KEPNER-TREGOE APPROACH & AHP IN BADAK LNG
by: Chrisna Kurnaedi Salam, Ricko -
BADAK LNG MAINTENANCE DEPARTMENT PERFORMANCE MEASUREMENT SYSTEM DEVELOPMENT
by: SYAHRUDDIN, NASRUL -
REDUCING INCIDENT BY IMPROVEMENT OF KNOWLEDGE MANAGEMENT PROGRAM CASE STUDY CONTRACT EMPLOYEE IN STATIONARY EQUIPMENT & CONSTRUCTION SECTION MAINTENANCE DEPARTMENT - BADAK LNG
by: Purba, Sofyan -
WORK ORDER AGEING EVALUATION: CASE STUDY AT MAINTENANCE DEPARTMENT PT BADAK NGL
by: Bagus Mantik, Kurnia -
PROPOSED NEW STRATEGY FOR DEFINED BENEFIT PENSION FUND OF BADAK LNG IN DANA PENSIUN PERTAMINA (CASE STUDY BADAK LNG)
by: Arfianto, Fany