ANALYZING EFFECTIVENESS OF BADAK LNG PREVENTIVE MAINTENANCE (PM) WORK ORDER FOR ELECTRICAL EQUIPMENT
Badak LNG is one of the largest LNG plant in the world consist of 8 trains and has been running for more than 4 decades to produce LNG and LPG. In early 2000, Badak LNG was the largest LNG producers in the world in around 22.5 MTPA and the rest of the product was LPG. There are 110,000 equipment ins...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/44079 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!