SCHEDULING THREE-STAGE HYBRID FLOWSHOP BY CONSIDERING LEAD TIME OF SPARE PARTS ORDERING, FIXED TECHNICIAN AND DEDICATED MACHINE TO MINIMIZE MAKESPAN

Flowshop scheduling is a setting when a job has to go through several stages of the process in sequence. This study discusses the scheduling of three-phase hybrid flowshop by considering the lead time for ordering spare parts, the use of special machines (dedicated machines) and fixed technicians. T...

Full description

Saved in:
Bibliographic Details
Main Author: Windhi P, Oktifian
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/44081
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first