SCHEDULING THREE-STAGE HYBRID FLOWSHOP BY CONSIDERING LEAD TIME OF SPARE PARTS ORDERING, FIXED TECHNICIAN AND DEDICATED MACHINE TO MINIMIZE MAKESPAN
Flowshop scheduling is a setting when a job has to go through several stages of the process in sequence. This study discusses the scheduling of three-phase hybrid flowshop by considering the lead time for ordering spare parts, the use of special machines (dedicated machines) and fixed technicians. T...
Saved in:
Main Author: | Windhi P, Oktifian |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/44081 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BATCH SCHEDULING MODEL FOR HYBRID FLOWSHOP WITH ASSEMBLY AND DEDICATED MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: SHOLIKHA, NIKMATUS -
BATCH SCHEDULING MODEL FOR HYBRID FLOWSHOP WITH ASSEMBLY AND DEDICATED MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Sholikha, Nikmatus -
A New Job Priority Rule for the NEH-based heuristic to Minimize Makespan in Permutation Flowshops
by: Jiang-Hua Zhang, et al.
Published: (2023) -
Mixed-criticality scheduling to minimize makespan
by: Guo, Zhishan, et al.
Published: (2018) -
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
by: Liu, S.Q., et al.
Published: (2014)