DEVELOPMENT OF TWO STAGE HYBRID FLOWSHOP MODEL CONSIDERING BATCH PROCESSOR & PARALLEL MACHINES
This study discusses the problem of scheduling two-stage hybrid flowshop with one batch processor machine in the first stage and parallel unrelated machines in the second stage. The problem in this study is that each job has a different release time and size which will then be grouped into batche...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46661 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |