DEVELOPMENT OF TWO STAGE HYBRID FLOWSHOP MODEL CONSIDERING BATCH PROCESSOR & PARALLEL MACHINES
This study discusses the problem of scheduling two-stage hybrid flowshop with one batch processor machine in the first stage and parallel unrelated machines in the second stage. The problem in this study is that each job has a different release time and size which will then be grouped into batche...
Saved in:
Main Author: | Nauli, Rahmawati |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46661 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BATCH SCHEDULING MODEL ON THREE-STAGE FLOWSHOP WITH TWO-STAGE JOB PROCESSOR AND ONE STAGE BATCH PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOWTIME
by: Poeri Suryadhini, Pratya -
NO-WAIT BATCH SCHEDULING ALGORITHMS IN THE TWO-STAGE HYBRID FLOWSHOP SYSTEM
by: Nadiana Dewi Astuti, Arnita -
BATCH SCHEDULING MODEL ON A THREE-STAGE FLOWSHOP WITH THE SEQUENCE OF JOB PROCESSOR BATCH PROCESSOR JOB PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Az Zahro, Shafira -
BATCH SCHEDULING MODEL FOR HYBRID FLOWSHOP WITH ASSEMBLY AND DEDICATED MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: SHOLIKHA, NIKMATUS -
BATCH SCHEDULING MODEL FOR HYBRID FLOWSHOP WITH ASSEMBLY AND DEDICATED MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Sholikha, Nikmatus