A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units

10.1016/S1570-7946(05)80036-7

Saved in:
Bibliographic Details
Main Authors: Liu, Y., Karimi, I.A.
Other Authors: CHEMICAL & BIOMOLECULAR ENGINEERING
Format: Article
Published: 2014
Subjects:
Online Access:http://scholarbank.nus.edu.sg/handle/10635/54031
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore