A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units
10.1016/S1570-7946(05)80036-7
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/54031 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-54031 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-540312024-11-10T12:26:49Z A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units Liu, Y. Karimi, I.A. CHEMICAL & BIOMOLECULAR ENGINEERING batch plant makespan MILP multi-product scheduling 10.1016/S1570-7946(05)80036-7 Computer Aided Chemical Engineering 20 C 1165-1170 2014-06-16T09:25:48Z 2014-06-16T09:25:48Z 2005 Article Liu, Y.,Karimi, I.A. (2005). A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units. Computer Aided Chemical Engineering 20 (C) : 1165-1170. ScholarBank@NUS Repository. <a href="https://doi.org/10.1016/S1570-7946(05)80036-7" target="_blank">https://doi.org/10.1016/S1570-7946(05)80036-7</a> 15707946 http://scholarbank.nus.edu.sg/handle/10635/54031 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
batch plant makespan MILP multi-product scheduling |
spellingShingle |
batch plant makespan MILP multi-product scheduling Liu, Y. Karimi, I.A. A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units |
description |
10.1016/S1570-7946(05)80036-7 |
author2 |
CHEMICAL & BIOMOLECULAR ENGINEERING |
author_facet |
CHEMICAL & BIOMOLECULAR ENGINEERING Liu, Y. Karimi, I.A. |
format |
Article |
author |
Liu, Y. Karimi, I.A. |
author_sort |
Liu, Y. |
title |
A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units |
title_short |
A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units |
title_full |
A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units |
title_fullStr |
A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units |
title_full_unstemmed |
A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units |
title_sort |
continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/54031 |
_version_ |
1821203726035058688 |