THE MATCH OF DIGGING-LOADING EQUIPMENT WITH HAULING EQUIPMENT IN WASTE MATERIAL HANDLING IN PT AGINCOURT RESOURCES (TAMBANG EMAS MARTABE)

PT Agincourt Resouces (Tambang Emas Martabe) is located in Aek Pining Village, Batang Toru District, Tapanuli Selatan Regency, North of Sumatera. This company strives to carry out an optimal mining operation. A good quality of mine planning is needed to ensure the mining operation runs efficiently a...

Full description

Saved in:
Bibliographic Details
Main Author: L Herdayatamma, K
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/44095
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:44095
spelling id-itb.:440952019-10-01T15:51:47ZTHE MATCH OF DIGGING-LOADING EQUIPMENT WITH HAULING EQUIPMENT IN WASTE MATERIAL HANDLING IN PT AGINCOURT RESOURCES (TAMBANG EMAS MARTABE) L Herdayatamma, K Indonesia Final Project optimum, cycle time, efficiency, productivity, match factor. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/44095 PT Agincourt Resouces (Tambang Emas Martabe) is located in Aek Pining Village, Batang Toru District, Tapanuli Selatan Regency, North of Sumatera. This company strives to carry out an optimal mining operation. A good quality of mine planning is needed to ensure the mining operation runs efficiently and effectively. A part of the planning is determination of number of digging-loading and hauling equipment. The aim of this study is to know how efficient a mining operation that happened in a period of time and to provide recommendation of heavy eqipment that proper to use. Fourty six cycle time data were taken from one digging and loading equipment (Excavator CAT 390D) and seven hauling equipments (Articulated Dump Truck CAT 745). Those data are processed using certain formula to make a result of efficiency, productivity of equipment, and match factor. The result shows that the mining operation had not been running optimally. The efficiency of hauling equipment is 67% while the efficiency of digging-loading equipment is 74%. Both digging-loading and hauling equipment have exceeded production rate (297 BCM/hour) with productivity of 383 BCM/hour for hauling equipment and 356.7 BCM/hour for digging-loading equipment. The value of actual match factor is 1.0274 that is close to ideal value (equal to 1). However, it still can be optimized by reducing one of the hauling equipment, so the value of match factor becomes 0.88. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Agincourt Resouces (Tambang Emas Martabe) is located in Aek Pining Village, Batang Toru District, Tapanuli Selatan Regency, North of Sumatera. This company strives to carry out an optimal mining operation. A good quality of mine planning is needed to ensure the mining operation runs efficiently and effectively. A part of the planning is determination of number of digging-loading and hauling equipment. The aim of this study is to know how efficient a mining operation that happened in a period of time and to provide recommendation of heavy eqipment that proper to use. Fourty six cycle time data were taken from one digging and loading equipment (Excavator CAT 390D) and seven hauling equipments (Articulated Dump Truck CAT 745). Those data are processed using certain formula to make a result of efficiency, productivity of equipment, and match factor. The result shows that the mining operation had not been running optimally. The efficiency of hauling equipment is 67% while the efficiency of digging-loading equipment is 74%. Both digging-loading and hauling equipment have exceeded production rate (297 BCM/hour) with productivity of 383 BCM/hour for hauling equipment and 356.7 BCM/hour for digging-loading equipment. The value of actual match factor is 1.0274 that is close to ideal value (equal to 1). However, it still can be optimized by reducing one of the hauling equipment, so the value of match factor becomes 0.88.
format Final Project
author L Herdayatamma, K
spellingShingle L Herdayatamma, K
THE MATCH OF DIGGING-LOADING EQUIPMENT WITH HAULING EQUIPMENT IN WASTE MATERIAL HANDLING IN PT AGINCOURT RESOURCES (TAMBANG EMAS MARTABE)
author_facet L Herdayatamma, K
author_sort L Herdayatamma, K
title THE MATCH OF DIGGING-LOADING EQUIPMENT WITH HAULING EQUIPMENT IN WASTE MATERIAL HANDLING IN PT AGINCOURT RESOURCES (TAMBANG EMAS MARTABE)
title_short THE MATCH OF DIGGING-LOADING EQUIPMENT WITH HAULING EQUIPMENT IN WASTE MATERIAL HANDLING IN PT AGINCOURT RESOURCES (TAMBANG EMAS MARTABE)
title_full THE MATCH OF DIGGING-LOADING EQUIPMENT WITH HAULING EQUIPMENT IN WASTE MATERIAL HANDLING IN PT AGINCOURT RESOURCES (TAMBANG EMAS MARTABE)
title_fullStr THE MATCH OF DIGGING-LOADING EQUIPMENT WITH HAULING EQUIPMENT IN WASTE MATERIAL HANDLING IN PT AGINCOURT RESOURCES (TAMBANG EMAS MARTABE)
title_full_unstemmed THE MATCH OF DIGGING-LOADING EQUIPMENT WITH HAULING EQUIPMENT IN WASTE MATERIAL HANDLING IN PT AGINCOURT RESOURCES (TAMBANG EMAS MARTABE)
title_sort match of digging-loading equipment with hauling equipment in waste material handling in pt agincourt resources (tambang emas martabe)
url https://digilib.itb.ac.id/gdl/view/44095
_version_ 1822926766313832448